Peering over the Fence: Under Construction

A look at some of the ongoing changes on April 11, 2017.

IMG_0240
Before:  This picture was taken in the fall.  The tree on the left, and the trees behind the tower, in the courtyard are clearly visible.
IMG_0486
Before:  The tree between the two palms was still in place on March 29th.
IMG_0502
After:  Dirt in the grass in the center of the photo used to be a tree.  Notice that the trees in the courtyard also disappeared.
IMG_0509
After:  a clear view of the chimney in the courtyard.  In addition to the missing trees, most of the interior details have been stripped off and hauled away.
IMG_0277
Before:  trees in the courtyard.

IMG_0505

IMG_0664
All of the wrought iron has been removed from the exterior of the building.
IMG_0662
The fountain has been removed from the courtyard.
IMG_0663
Looking at what was once P116 and now is only a frame.
IMG_0667
Looking down the corridor to the Viking office.  The flooring has been removed.
IMG_0666
P119 has been reduced to studs.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s